Installation guides, compliance documents, and technical specifications for FujiClean ATT/ATU systems.
Step-by-step installation documentation for licensed contractors.
Complete installation guide for the CE Series ATT system including site preparation, tank placement, and electrical connections.
Pre-startup and commissioning checklist required before system activation and DEQ inspection.
Required compliance documentation for Oregon DEQ approval and permitting.
Official Oregon DEQ approval documentation confirming FujiClean ATT systems meet state treatment standards.
Operations and maintenance manual template required for all ATT/ATU system installations in Oregon.
Engineering specifications and product data sheets.
Detailed technical specifications, dimensions, flow rates, and treatment performance data for the CE Series.
Wiring diagrams, control panel specifications, and alarm system documentation.
Contact our technical support team for system-specific documentation, custom specifications, or compliance assistance.
Contact Technical Support